This Is A Custom Widget

This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.

This Is A Custom Widget

This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.
/Tag:Road Work

Queen St Hill Closure

Please note that as a result of both sanitary sewer and water service repair works fronting 399 / 400 Queen St. S. ,  Queen St. / Beckett Dr. will be closed to through traffic between Aberdeen Ave. and Glenfern Ave. on SUNDAY July 5th from 7 a.m. until or before 5 p.m.   Through traffic heading [...]

By | July 3rd, 2015|Road Work|Comments Off on Queen St Hill Closure

Westbloom Sidewalk Work

A heads up to Kernighan residents that live in one of the new homes in the West Bloom subdivision.  There will be road work taking place on the street starting April 8th.  The work is to complete the curbs and sidewalks in the area. No street parking will be permitted during working hours to help [...]

By | April 7th, 2015|Road Work|Comments Off on Westbloom Sidewalk Work

Wall, Guardrails, and Roadwork on Claremont May 2015

As part of the City of Hamilton's commitment to infrastructure improvement and rehabilitation there is work coming to your neighbourhood.  The City of Hamilton has a contract with Dufferin Construction to complete a wall and guardrail as well as asphalt work. Residents should be notified by a hand delivered notice 24 hours prior to any work taking place. [...]

By | March 20th, 2015|Infrastructure, Road Work, Roads|Comments Off on Wall, Guardrails, and Roadwork on Claremont May 2015

Road and Sidewalk work May 4, 2015

As part of the City of Hamilton's commitment to infrastructure improvement and rehabilitation there is work coming to your neighbourhood.  The City of Hamilton has a contract with Dufferin Construction to complete the work started in 2014. Residents should be notified by a hand delivered notice 24 hours prior to any work taking place. The streets affected [...]

By | March 20th, 2015|Infrastructure, Road Work, Roads|Comments Off on Road and Sidewalk work May 4, 2015

Pre-construction Inspections – March 23, 2015

Special Inspection Notice OZA Inspections has been retained by Dufferin Construction to perform inspections of buildings near to the planned watermain and sewer replacement.  Due to the nature of the work planned and potential vibrations caused during installation OZA Inspections will be investigating nearby buildings that are close to the construction site. Inspectors may need [...]

By | March 19th, 2015|Road Work|Comments Off on Pre-construction Inspections – March 23, 2015

Sewer Work – March 23, 2015

As part of the City of Hamilton's commitment to infrastructure improvement and rehabilitation there is work coming to your neighbourhood.  The City of Hamilton has a contract with Dufferin Construction to replace the watermain and sanitary sewer on West 5th St and Fennell Ave West. Residents should be notified by a hand delivered notice 24 hours [...]

By | March 19th, 2015|Infrastructure, Road Work, Roads|Comments Off on Sewer Work – March 23, 2015

March 19, 2015 Road Closure Notice

Partial Road Closure Notice Please be advised that City crews will be working at the intersection of Upper Paradise and Sanatorium on Thursday March 19, 2015 during the daytime hours.  Crews will be working on sewer man-hole construction. During the construction period traffic on both the east and west approaches of Sanatorium Ave will only be [...]

By | March 18th, 2015|Road Work, Roads|Comments Off on March 19, 2015 Road Closure Notice

News for Rymal Road West

Title: News for Rymal Road West Location: Lecture Hall of St. Thomas More Highschool Description: January 27 2014 To the Residents of Rymal Road East West Corridor Ward 8 I am thrilled to advise some very exciting news for the residents of the neighborhoods that border Rymal Road West from Upper James to Glancaster Road. [...]

By | January 31st, 2014|News|Comments Off on News for Rymal Road West

Queen Street Hill Closure Meeting

Title: Queen Street Hill Closure Meeting Location: City Hall, Council Chambers Description: Hosting a public meeting at City Hall in the Council Chambers (Second Floor). Staff will be provide information on the closure of the Queen Street Hill, including scope of work, timeline and answer to any questions residents may have. All are welcome to [...]

By | May 17th, 2013|News|2 Comments